Margarita I and Josefa Rufina I Power Barges
- Client:
- Waller Marine
- Scope:
- Two ABS classification 171 MW gas turbine power barges, the foundation of the world's largest floating power generation facility. Signal worked with Waller Marine on the design, construction and delivery of the barges to Venezuela for final fit-up and commissioning.
- Challenges:
- 180-day timeline required fast-track engineering, procurement and construction
- Duration:
- 6 months
- Facility:
- Orange Yard (Texas)
- Details:
- Large indoor fabrication facilities provided efficient and productive work environment. Implementation of Continuous Flow Manufacturing supported project success. A dedicated project management team focused on integration of all elements in the production system. These efforts led to customer satisfaction and on-time/on-budget project completion.